TABLE OF CONTENTS

 

1.         INTRODUCTION

Project Background

Project Scope

Purpose of the Manual

Project Organisation

Structure of the EM&A Manual

2.         WATER QUALITY

Water Quality Parameters

Monitoring Equipment for Marine Water Quality Monitoring

Laboratory Measurement / Analysis for Marine Water

Marine Water Monitoring Locations

Baseline Marine Water Monitoring

Impact Marine Water Monitoring

Post-construction Marine Water Monitoring

Field Log for Marine Water Monitoring

Construction Site Audits

Event and Action Plan for Construction Water Quality

Mitigation of Adverse Environmental Impacts

3.         NOISE 

Introduction

Noise Parameters

Monitoring Equipment and Methodology

Noise Monitoring Locations

Baseline Monitoring

Impact Monitoring

Event and Action Plan

Mitigation Measures

4.         AIR QUALITY

Introduction

Objectives of Dust Monitoring

Monitoring Parameters and Equipment

Proposed Dust Monitoring Stations

Baseline Monitoring

Impact Monitoring

Compliance Assessment

Event and Action Plan

Mitigation Measures

5.         WASTE MANAGEMENT IMPLICATIONS

Introduction

Mitigation Measures

6.         Site ENVIRONMENTAL AUDIT

Site Inspection

Compliance with Legal and Contractual Requirements

Environmental Complaints

7.         REPORTING

Introduction

Baseline Monitoring Report

Monthly EM&A Reports

First Monthly EM&A Report

Subsequent Monthly EM&A Reports

Quarterly EM&A Summary Reports

Final EM&A Review Report

Data Keeping

Interim Notifications of Environmental Quality Limit Exceedances

 

 

List of Tables

 

Table 2.1               Analytical Methods to be applied to Marine Water Quality Samples                           

Table 2.2               Proposed Marine Water Quality Stations for Baseline and Impact Monitoring             

Table 2.3               Proposed Marine Water Quality Monitoring Frequency and Parameters                     

Table 2.4               Action and Limit Levels for Marine Water Quality at Seawater Intakes                        

Table 2.5               Event and Action Plan for Marine Water Quality                                                        

Table 3.1               Noise Monitoring Stations during Construction Phase                                              

Table 3.2               Action and Limit Levels for Construction Noise                                                        

Table 3.3               Event and Action Plan for Construction Noise Monitoring                                         

Table 4.1               Proposed Dust Monitoring Locations                                                                      

Table 4.2               Summary of Dust Monitoring Programme                                                                

Table 4.3               Proposed Action and Limit Levels for Impact Monitoring                                          

Table 4.4               Event and Action Plan for Construction Dust Monitoring                                           

 

 

List of Figures

 

 

NEX2213/C/331/ENS/M50/501

Project Site Plan

NEX2213/C/331/ENS/M50/502

General Layout Plan (Sheet 1 of 2)

NEX2213/C/331/ENS/M50/503

General Layout Plan (Sheet 2 of 2)

NEX2213/C/331/ENS/M62/501

Project Organisation

NEX2213/C/331/ENS/M62/510

Locations of Water Quality Monitoring Stations 

NEX2213/C/331/ENS/M62/520

Locations of Noise Monitoring Stations 

NEX2213/C/331/ENS/M62/530

Locations of Dust Monitoring Stations

 

 

List of Appendices

 

Appendix A

Implementation Schedule and Recommended Mitigation Measures

Appendix B1

Water Quality Monitoring Data Record Sheet

Appendix B2

Construction Noise Monitoring Field Record Sheet

Appendix B3

Data Record Sheet for TSP Monitoring

Appendix C

Sample of the Interim Notification