TABLE
OF CONTENTS
Project
Background
Project Scope
Purpose of
the Manual
Project
Organisation
Structure of
the EM&A Manual
Water Quality
Parameters
Monitoring
Equipment for Marine Water Quality Monitoring
Laboratory
Measurement / Analysis for Marine Water
Marine Water
Monitoring Locations
Baseline
Marine Water Monitoring
Impact Marine
Water Monitoring
Post-construction
Marine Water Monitoring
Field Log for
Marine Water Monitoring
Construction
Site Audits
Event and
Action Plan for Construction Water Quality
Mitigation of
Adverse Environmental Impacts
Introduction
Noise Parameters
Monitoring
Equipment and Methodology
Noise
Monitoring Locations
Baseline
Monitoring
Impact
Monitoring
Event and
Action Plan
Mitigation
Measures
Introduction
Objectives of
Dust Monitoring
Monitoring
Parameters and Equipment
Proposed Dust
Monitoring Stations
Baseline
Monitoring
Impact
Monitoring
Compliance
Assessment
Event and
Action Plan
Mitigation
Measures
5. WASTE MANAGEMENT IMPLICATIONS
Introduction
Mitigation
Measures
Site
Inspection
Compliance
with Legal and Contractual Requirements
Environmental
Complaints
Introduction
Baseline
Monitoring Report
Monthly
EM&A Reports
First Monthly
EM&A Report
Subsequent
Monthly EM&A Reports
Quarterly
EM&A Summary Reports
Final
EM&A Review Report
Data Keeping
Interim
Notifications of Environmental Quality Limit Exceedances
List of Tables
Table 2.1 Analytical
Methods to be applied to Marine Water Quality Samples
Table 2.2 Proposed
Marine Water Quality Stations for Baseline and Impact Monitoring
Table 2.3 Proposed
Marine Water Quality Monitoring Frequency and Parameters
Table 2.4 Action
and Limit Levels for Marine Water Quality at Seawater Intakes
Table 2.5 Event
and Action Plan for Marine Water Quality
Table 3.1 Noise
Monitoring Stations during Construction Phase
Table 3.2 Action
and Limit Levels for Construction Noise
Table 3.3 Event
and Action Plan for Construction Noise Monitoring
Table 4.1 Proposed
Dust Monitoring Locations
Table 4.2 Summary
of Dust Monitoring Programme
Table 4.3 Proposed
Action and Limit Levels for Impact Monitoring
Table 4.4 Event
and Action Plan for Construction Dust Monitoring
List of Figures
Project Site Plan |
|
General Layout Plan (Sheet 1 of 2) |
|
General Layout Plan (Sheet 2 of 2) |
|
Project Organisation |
|
Locations of Water Quality Monitoring Stations |
|
Locations of Noise Monitoring Stations |
|
Locations of Dust Monitoring Stations |
List of Appendices
Implementation
Schedule and Recommended Mitigation Measures |
|
Water Quality
Monitoring Data Record Sheet |
|
Construction
Noise Monitoring Field Record Sheet |
|
Data Record Sheet
for TSP Monitoring |
|
Sample of the Interim Notification |
|
|
|